BFF Construction and Design logoSteel Framing LAby BFF Construction and Design · CSLB #1109001 Call (747) 257-5457
Home / Fire rebuilds
Fire rebuilds · Pacific Palisades, Altadena & LA

Rebuilding After the Fire with a Steel Frame

For many families rebuilding after the 2025 fires, the question is what to build with this time. A light-gauge steel frame is non-combustible, so the structure itself does not add fuel. We met many Palisades homeowners at the rebuild expo, where ECOLIT LA showed a full steel frame.

  • Non-combustible structure
  • Shop-made wall panels
  • Licensed general contractor
ECOLIT LA steel frame at the Pacific Palisades rebuild expo
ECOLIT LA steel frame at the Pacific Palisades rebuild expo

Get a free estimate

Leave your name, phone and ZIP. Mike will call or text you back within 9 minutes.

⏱ We reply within 9 minutes (Mon–Sat, 8 AM–9 PM) — or get $1,000 off your project of $10,000+. Terms

Licensed California general contractor, CSLB #1109001. No spam, no sharing your number.

What to know before you rebuild in steel

The frame does not burn

Steel studs and joists are non-combustible. Fire safety still depends on the roof, vents, windows, siding and defensible space, which we plan together with your architect.

Same permits, same codes

A steel house goes through the same plan check and inspections. Rebuild permits run through your city or LA County.

Faster framing

Panels are made in the shop while the site is prepared, so framing on site takes much less time.

One team

BFF handles the permit process, foundation, frame assembly and finishes as your general contractor.

Planning a rebuild?

Call Mike to talk through your lot and plans, no obligation.

Get a free estimateCall (747) 257-5457
Call or text (747) 257-5457